

556 EL CAMINO REAL, BURLINGAME, CA
New Post-Tensioned Slab concrete building. Approximately 30,000 sq. ft. of residential (21 Condominium units), with rooftop garden and basement parking. A construction of Type I (4 hr.) over 2 levels of subterranean Automated Stacked Parking, manufactured by city Lift.
Client: Burlingame Investor LP
Architect: RSS Architecture
Cost: $20,000,000
Firm’s Role: Structural Design
Status: Currently under design development. Planning commission approved the project.